ASFROM Toe Cap Molding Machine 4 Hots 4 Colds FAQ
ASFROM Toe Cap Molding Machine 4 Hots 4 Colds FAQ
Toe Cap Molding Machine 4 Hots 4 Colds Base Q&A
一.Application & Output Advantage FAQs
Q1: What shoe styles can this 4C4H toe cap machine process?
A1: It is used for pre-forming toe caps of sports shoes, casual shoes, leather shoes and California shoes, covering most mainstream footwear styles.
Q2: What production advantage does 4 hot + 4 cold four-station design have compared with 2C2H model?
A2: Four hot stations and four cold stations work simultaneously, the output reaches 2000 pairs per 8 working hours, which is higher efficiency than dual-station machines, suitable for mass production factories with large daily orders.



二. Core System & Feature FAQs
Q3: What is the heating performance of the top-mounted steam hot mold system?
A3:The steam heating unit is installed on the top of the machine:
- Heat up to 120°C within 15 minutes;
- Temperature fluctuation controlled at ±2~5°C, stable heating for all kinds of shoe upper materials;
- Even steam softening makes uppers fit lasts tightly with better elasticity and surface gloss.
Q4: How about the closed direct cooling system?
A4:Equipped with independent sealed refrigeration system, refrigerator power 3/8HP:
- Rapid cooling down to -15°C in only 5 minutes;
- Uniform cooling on the whole toe cap without local deformation, stable shaping quality.
Q5: Is the mold easy to replace? What’s the matching precision?
A5:Molds are fixed by quick snap buckles, matched with Teflon binding straps and custom shoe lasts, with 98% dimensional accuracy based on customer shoe samples. Skilled workers can finish disassembly and replacement of one mold set within 5–6 minutes.
Q6: Can the fixture tightener be adjusted for different shoe toe shapes?
A6: Yes. The customized tightener firmly locks the edge of shoe uppers, helps uppers fit shoe lasts perfectly to form ideal toe radian. It supports flexible adjustment, disassembly and replacement, convenient for daily machine maintenance.
P7: ¿Para qué sirve la luz de posicionamiento LED roja de tres ejes?
R7: Los sensores de monitorización en tiempo real integrados ajustan automáticamente los ángulos del haz en un amplio rango; el posicionamiento preciso elimina el desplazamiento durante la alimentación superior, lo que garantiza una posición de moldeado constante para cada par de zapatillas.
Pregunta 8: ¿Qué sistema de control lleva incorporada esta máquina?
A8: Control centralizado completo mediante PLC con interfaz de usuario de pantalla táctil. Todos los parámetros de temperatura de calentamiento, tiempo de enfriamiento, presión de prensado y retardo pueden configurarse y ajustarse con precisión desde un único panel, lo que facilita su manejo.
III. Preguntas frecuentes sobre los parámetros técnicos completos
Q9: What are the electrical specifications of ACH-712E-4C4H?
A9:
- Alimentación eléctrica: monofásica, 220 V / 50 Hz
- Total machine power: 5.5Kw
- Max heating temperature: 200℃
- Temperature control precision: ±2℃
- Refrigerator power: 3/8HP
- Max clamping pressure: 6-8KGS
Q10: What are the machine size, package size, weight and daily output?
A10:
- Machine overall dimension: 16008201630MM
- Export package dimension: 17209401780MM
- Net weight: 380KGS; Gross weight: 480KGS
- Production capacity: 2000 pairs per 8 hours
四.Customization & Matching FAQs
Q11:Can we customize molds and fixtures according to our shoe samples?
A11:Yes. All cold mold clamps, Teflon binding tighteners and shoe last molds can be tailor-made based on customer’s shoe styles to guarantee perfect toe shaping effect.
Q12: What air pressure standard needs to be matched with this machine?
A12:It needs to be equipped with air compressor providing air pressure above 6kg/cm² to support stable mold pressing action.
五.Operation & Maintenance General FAQs
Q13: Is the operation logic the same as the 2C2H two hot two cold model?
A13:The core hot softening + cold forming process is consistent. Only this machine has double stations, allowing four pairs of shoes to be processed at the same time, and all temperature, time and pressure parameter setting operations are identical.
Q14: What daily maintenance work should be done regularly?
A14:
- Clean the refrigeration radiator filter every day to avoid poor cooling effect and overloaded compressor;
- Keep the machine internal and surrounding environment ventilated and clean;
- Regularly check the steam pipeline and air circuit for leakage, lubricate movable parts periodically.
六.After-sales Document FAQs
Q15: Will complete English operation documents be delivered together with the machine?
A15: Yes, we provide full English operation manual, parameter instruction and circuit drawings, electronic PDF files can be sent to customers in advance via email.
Pregunta 17: ¿Qué tareas de mantenimiento diario hay que realizar?
A17:
- Diariamente: Vacíe el agua de la unidad combinada de aire de tres puntos y mantenga un nivel suficiente de lubricante; limpie el filtro del radiador de refrigeración para evitar una refrigeración deficiente y una sobrecarga del compresor;
- Semanalmente: Rellenar el aceite lubricante de los brazos extensibles de la máquina;
- A largo plazo: Mantenga la circulación del aire en el entorno y mantenga limpios el cuerpo de la máquina y los componentes eléctricos, evitando la acumulación de polvo.

